Reader's GuideRMCSD Finance · Aug 24, 2026

Independent guide · Destination Rancho Murieta

What's actually in the 158-page Finance packet

Rancho Murieta CSD's Finance Committee meets in special session on Monday, August 24 to receive two years of overdue audits, a status report on two more years still unaudited, and preliminary numbers for the fiscal year that ended eight weeks ago. Nothing gets voted on. Everything gets said out loud. Here is where to find each piece, what the numbers say, and what is worth listening for.

Meeting
Special Finance Committee
When
Mon, Aug 24, 2026 · 10:00 a.m.
Where
15160 Jackson Road
Committee
Merchant & Gere
Packet
158 pages
Action items
None — all informational
01 — Orientation

Start here: the five-minute version

If you read nothing else, read these nine sentences.

  • Richardson & Company, LLP will present the June 30, 2023 and June 30, 2024 audits together — two fiscal years audited concurrently to catch up a backlog. pp. 2–14
  • Every audit document in the packet carries a "DRAFT — SUBJECT TO CHANGE" watermark, and every signature date is a blank line reading __________, 2026. pp. 17, 19, 57
  • The Water and Sewer funds again received a qualified (modified) opinion, because the District still has not verified that all developer-donated infrastructure and easements are on its books. p. 17
  • Three prior-year material weaknesses remain open; no new ones were found, and four older findings were resolved. pp. 11, 56, 58–59
  • The management letter notes the investment policy has not been updated since 2016 despite an annual review requirement, and reserve balances don't match the reserve policy. The District's written responses: "No change" and "No comment." pp. 110–111
  • FY2025 and FY2026 are still not audited. FY25 prep began end of July 2026; FY26 prep began mid-August 2026 with bank reconciliations about 30% done. pp. 140, 142
  • Preliminary FY2026 shows a $819,316 operating loss, turned into a $170,601 positive result only by $989,917 of property tax revenue. pp. 145, 154
  • Total expenses came in at 107% of budget — $637,000 over — with individual lines at 268%, 301%, 469%, 627% and 3,370%. pp. 146–151
  • Staff floats moving ~$2.6 million from restricted investment accounts into the unrestricted operating account to hit a six-month reserve target of roughly $5 million. p. 158

How to use the page numbers

Every red chip like p. 145 is the page number printed in the bottom-right corner of the packet PDF, which matches the PDF's own page count. Type that number into your PDF viewer's page box and you'll land on it.

02 — The agenda

The agenda, item by item

Seven lines on one page. Four of them are informational presentations; none of them is a vote.

Agenda — Special Finance Committee, Aug 24, 2026 p. 1
#ItemTypeBackup in packet
1Call to OrderProcedural—
2Comments from the PublicPublicComment card to Board Secretary before comments open
3FY23 and FY24 Audit PresentationInformationpp. 2–139
4FY25 and FY26 Audit Preparation Status UpdateInformationpp. 140–142
5Financial Update, 12 months ended June 30, 2026Informationpp. 143–158
6Director and Staff Comments/SuggestionsDiscussion—
7AdjournmentProcedural—

Because this is a special meeting, the agenda carries the Government Code §54957.5 language about late-distributed writings, and the posting note states the agenda was posted at the District Office on August 21, 2026 at 3:00 p.m. p. 1 Accommodation requests go to the District Office at 916-354-3700 or dfleet@rmcsd.com.

Worth noting

A two-member committee receiving information is not the Board acting. Anything the committee wants the full Board to adopt — a reserve policy update, an investment policy review, acceptance of the audits — has to travel to a Board agenda separately. Listen for whether items 3–5 get forwarded, and when.

03 — Status of the audits

Why these audits say DRAFT

The audits are being presented, not issued. That distinction matters for how much weight the numbers can carry.

Every page of the FY24 report, the FY23 report, the internal control report, the required communications letter, the management letter, and both CFD reports is stamped DRAFT — SUBJECT TO CHANGE down the side of the page. The auditor's report itself ends with an unfilled date line: "___________, 2026." p. 19 The internal control report and the management letter do the same. p. 57 p. 111

The required communications letter records that the engagement letter for these audits was dated April 9, 2025, and that the management representation letter date is also still blank. p. 105 p. 107 A management representation letter is one of the last things signed before an auditor releases an opinion.

The practical read

Draft financial statements can and do change between presentation and issuance. Figures cited from this packet are best described as "as presented in draft to the Finance Committee on August 24, 2026" rather than as final audited results. A reasonable thing to ask at the meeting: what remains open, and on what date do the signed reports get issued?

One more thing the auditor flagged

Under "Other Matters," the auditor states that management omitted the Management's Discussion and Analysis that generally accepted accounting principles require to accompany the basic financial statements. The auditor notes the omission does not affect the opinions, but GASB considers MD&A an essential part of financial reporting. p. 19 MD&A is the narrative section where a district explains its own results in plain language — the part a resident would most likely read.

04 — The opinion

The qualified opinion on Water & Sewer

Three of five funds got a clean opinion. Two did not, for the same reason as in prior years.

The auditor issued a qualified opinion on the Water and Sewer funds and unmodified (clean) opinions on the Drainage, Solid Waste and Security funds. p. 17

The stated reason: in past years management had not adopted a methodology for verifying that easements and developer-donated infrastructure were recorded in the Water and Sewer funds, so the completeness of capital assets has not been verified. Recording those assets would increase assets and investment in capital assets and change depreciation expense in both funds. p. 17 The auditor adds that the amount of the effect has not been determined. p. 18

In plain terms

A qualified opinion means: the statements are fair except for one identified issue. Here the issue is that nobody knows how much infrastructure developers have handed over to the District across the decades without it being written onto the District's books. Because the size is undetermined, the correction could be small or large.

The District is not standing still on this. In its response to the related finding, the District says it has begun evaluating developer-donated infrastructure, recorded identified contributions and related depreciation in both the general ledger and the fixed asset subledger for FY2023 and FY2024, and expects to finish identifying all such assets in later fiscal years. p. 59 The auditor's own status line is blunter: this issue still exists, though donated infrastructure was properly recorded in FY2023 and FY2024. p. 59

05 — Audited figures

FY2024 and FY2023 by the numbers

Two years side by side, as presented in the auditor's slides and the draft statements behind them.

Statement of Net Position, June 30 pp. 5–7, 20–21
In thousands20242023Change
Cash — unrestricted$3,771$3,385+$386
Cash — restricted10,8949,805+1,089
Interfund loan240369(129)
Other assets2,2342,000+234
Capital assets31,35030,420+930
Total assets$48,489$45,979+$2,510
Current liabilities3,3723,179+193
Interfund loan240369(129)
Pension and other benefits7,8076,467+1,340
Total liabilities$11,419$10,015+$1,404
Net investment in capital assets31,34730,412+935
Restricted10,4239,359+1,064
Unrestricted(1,570)(1,508)(62)
Total net position$40,200$38,263+$1,937
Board-designated (part of unrestricted)$568$545+$23
Pension and OPEB liabilities$7,601$6,291+$1,310
Revenues and expenses, year ended June 30 pp. 8, 22–23
In thousands20242023Change
Operating revenue$8,032$7,314+$718
Operating expenses(11,278)(10,179)(1,099)
Net income from operations(3,246)(2,865)(381)
Nonoperating revenue/expense1,680984+696
Capital contributions3,5032,862+641
Net income / (loss)$1,937$981+$956

Read the bottom line carefully

FY2024's $1.9 million "net income" sits on top of a $3.2 million operating loss. The swing comes from nonoperating revenue and $3.5 million of capital contributions — which include $1,871,178 of donated infrastructure, a non-cash entry recognizing pipes and facilities handed over by developers. p. 23 Donated infrastructure improves net position; it does not put money in the bank or reduce what it costs to run the plant.

Pension and OPEB

Net pension liability at June 30, 2024 was $4,963,825, based on the 2022 CalPERS valuation and up roughly $351,000 due to differences between actual and projected experience. Net OPEB liability was $2,636,958, based on a 2023 actuarial valuation, up $959,000. pp. 9–10, 21 The slides note no contributions were made to the OPEB trust in FY2022/23 or FY2023/24, though benefit payments of $288,000 and $297,000 were made. p. 10 Pension is Note 8; OPEB is Note 9. pp. 41–48

The custodial fund

The CFD custodial fund shows net position of $1,086,260, revenue exceeding expenses by $44,800, and $5.1 million of debt. pp. 9, 27–28 More on that in section 08.

06 — Internal control

Three material weaknesses, still open

No new findings this cycle. The three that carried over are the ones that explain why the audits are late.

The internal control report identifies material weaknesses as items 2022-001, 2021-001 and 2021-002, and reports no instances of noncompliance requiring disclosure under Government Auditing Standards. pp. 56–57 The auditor's slide summary: no current-year findings, three prior-year material weaknesses in process, no significant deficiencies, and four prior-year findings resolved. p. 11

Schedule of prior year findings pp. 58–59
FindingConditionCurrent status per auditor
2022-001
Timely record keeping
Accounting records not kept current during the year; payroll posted after year-end in one large journal entry; bank reconciliations not performed until after year-end. District has retained a Director of Finance working toward keeping the system up to date.
2021-001 / 2020-001
Year-end closing procedures
Audit delayed by slow closing entries, trial balances, schedules, reconciliations and account analyses; difficulty finding qualified staff. Qualified staff retained; streamlined process "substantially installed."
2021-002 / 2020-002
Developer-constructed infrastructure
Infrastructure deeded to the District not recorded as capital assets; one transaction identified dating back to 2007, "but there may be others." Issue still exists; donated infrastructure was properly recorded in FY2023 and FY2024.

The District's own response to 2022-001 is the most concrete progress marker in the packet: monthly payroll entries, cash receipts and revenue transactions have been brought current; beginning January 2026 preliminary financial reports were presented to the Finance Committee and Board; and as of August 2026 the District is finalizing accounting records through July 31, 2026. p. 58

Audit adjustments and unadjusted differences

Management corrected 4 audit adjustments for FY2024 and 7 for FY2023 — described by the auditor as a significant reduction compared with past audits. p. 106 Two uncorrected differences remain, each judged immaterial: an unaccrued invoice of $18,353 in FY2024 (plus accrued payroll understated by $11,011) and an unaccrued invoice of $18,381 in FY2023. pp. 108–109 The auditor identified management override of controls and revenue recognition as required significant risks, and reports no such issues were noted. pp. 105–106

07 — Management letter

The management letter: reserves & investments

Four recommendations — two new, two carried over. The two carried-over items are the ones with the shortest District responses.

New this cycle

  • Document retention. The District could not access certain billing records after migrating from the Utility Star billing system to Tyler during the FY23 audit; transaction data imported, but some customer invoices could not be retrieved in original format. Under Tyler the District now prints and retains all customer invoices monthly. p. 110
  • Check generation. Voided checks were not maintained in an organized manner and checks were not consistently pre-numbered, making completeness and sequence hard to verify. Beginning FY27 the District will run a monthly voided check report from Great Plains, file voided checks, and issue checks in sequential order. pp. 110–111

Carried over from past audits

Reserves and reserve policy

The auditor compared reserves established in policy against reserve amounts in the general ledger and noted inconsistencies, recommending the District review and update the policy and align ledger balances to it. The auditor also flags reserves carrying negative balances — the Water Capital Improvement Fee Reserve and the Security Capital Improvement Fee Reserve — and says the District needs a plan for them. p. 111

District response, in full, as printed: "No comment."

Investment policy

The District last updated its investment policy in 2016. The auditor notes the Government Code requires the investment policy to be reviewed by the Board annually, and that the District needs to place it on a Board agenda each year to comply. p. 111

District response, in full, as printed: "No change."

These two items sit directly upstream of the cash discussion in section 12: a reserve policy that doesn't match the ledger, and an investment policy a decade old, are the governing documents for any decision about moving $2.6 million between accounts.

08 — Component unit

CFD 2014-1, the Mello-Roos component unit

Roughly 60 pages of the packet are a separate audit of a separate entity that shares the District's board.

Community Facilities District No. 2014-1 (Rancho North / Murieta Gardens) was formed September 5, 2014 to finance water facilities supporting development on approximately 828 acres. On January 29, 2015 special tax bonds of $5,960,000 were issued under the Mello-Roos Community Facilities Act of 1982; a special tax approved by voters has been levied since the 2016-17 tax year to repay them. pp. 49, 119

CFD 2014-1 at June 30, 2024 pp. 117–118
ItemAmount
Cash and investments$788,779
Restricted cash$399,681
Total assets$1,194,252
Bonds payable$5,130,000
Bond interest payable$78,758
Due to CSD (accounts payable)$107,992
Property tax revenue$453,765
Interest income$41,830
Debt service — principal$150,000
Debt service — interest and other$238,900
Fund balance, end of year$1,086,260
Net position (government-wide view)($4,122,498)

Two numbers, one entity

The fund balance is a positive $1,086,260 and the net position is a negative $4,122,498. Both are correct. The fund view counts cash on hand; the government-wide view also subtracts the $5,130,000 of bonds still outstanding. p. 117

Key point for residents: the District is acting as agent for the property owners and is not liable for repayment of these bonds. p. 49 The special tax on parcels inside the CFD pays them.

09 — Agenda item 4

FY25 and FY26: how far behind

A one-page memo from the Director of Finance is the entire backup for agenda item 4. It is the most operationally revealing page in the packet.

The memo is dated August 12, 2026, from Cecilia Min, Director of Finance and Administration, to the Finance Committee and Board of Directors. p. 140

Audit and accounting status as reported pp. 140, 142
YearStatusDetail as written
FY23 / FY24CompletedPresented in draft at this meeting.
FY24 / FY25Preparation began end of July 2026Last financial report for that year was February 2025; March–June accounting work still to be entered. Revenue section complete, payroll in progress. Duplicated accounts-payable transactions identified and being removed. Bond accounting 80% complete. Review of repairs & maintenance transactions to capture fixed assets: 10%.
FY25 / FY26Preparation began mid-August 2026Bank reconciliation started, around 30%.
FY26 / FY27Current yearJuly accounting in progress.

The line to underline

"The last financial report for this fiscal year was February 2025, we must put in the accounting work from March to June." p. 140 That is four months of a closed fiscal year still to be recorded — and it is the fiscal year immediately before the one whose "preliminary" results are presented under agenda item 5.

10 — Agenda item 5

FY2026 preliminary: the $819,000 operating loss

Twelve months ended June 30, 2026 — explicitly labeled preliminary and subject to change.

Staff's own caveat leads the section: these figures will be subject to change after bank and balance sheet reconciliations, which will be completed in later months after the past audit years are finished. Monthly expenses are not consistent because coding was not consistent in those months, and negative amounts in certain months are reclassifications correcting year-to-date miscoding. p. 144

Preliminary results, 12 months ended June 30, 2026 pp. 145, 150–152, 154
LineActualBudget% of budget
Total operating revenue$9,394,943$9,611,85498%
Total operating expenses7,105,3736,897,910103%
Total general & administrative3,108,8872,679,197116%
Total expenses$10,214,260$9,577,107107%
Operating result before property tax($819,316)——
Property tax revenue989,917——
Operating result after property tax$170,601——

By fund

Operating result by fund p. 145
FundOperating resultDriver as stated by staff
Water($1,000,000)Higher repairs and maintenance, consulting, and salary expenses
Wastewater+$245,000—
Drainage($81,000)Repairs and maintenance exceeded budget by $55,000
Solid Waste+$35,000—
Security+$101,000Lower salary and benefit costs

The headline "net income" of $5.4 million

Below the operating lines, the statement reports net income of $5,428,358 against a budget of $2,819,636 — 193%. p. 152 That figure is built mainly from items that are not operating cash:

  • $3,405,961 of donated infrastructure — Riverview Phase 2 infrastructure accepted per Resolution 2025-12, split Water $1,340,110 / Wastewater $905,061 / Drainage $1,160,791. pp. 149, 152
  • $2,001,490 of reserve revenue — capital replacement, augmentation, impact and debt service fees, at 110% of budget. p. 152
  • $989,917 of property tax revenue, received in irregular lumps: $489,219 in February, $416,286 in May. p. 154
  • Offset by ($129,717) in other items, including $122,331 paid for groundwater well studies. pp. 149, 152

The distinction that matters

Operations lost $819,316 for the year. The $5.4 million is what happens when you add a one-time non-cash asset donation and restricted capital fees on top. Both facts are true; only one of them tells you whether rates cover the cost of running the utilities.

11 — Budget variance

Where the budget broke

Total expenses were $637,153 over budget. The composition is more interesting than the total.

Lines significantly over budget, FY2026 preliminary pp. 146–151
Line itemActualBudget% of budgetWhat staff says
HR & recruitment fees (G&A)$50,573$1,5013,370%HR to Go at $3.4k/month plus $18k in April–May for the General Manager executive search; neither was budgeted.
Utilities (G&A)$81,882$8209,990%Budget was loaded almost entirely into the Capacity Purchase account instead — see the note below.
Training & seminars (Ops)$15,934$2,500637%Security, utility and forklift training correctly booked here; the line was under-budgeted.
Consulting fees (G&A)$245,808$39,201627%Interim placements for Director of Finance, A/P and District Secretary originally budgeted under salaries, plus ~$16,000 of Great Plains accounting-system consulting.
Travel & mileage (G&A)$23,431$5,001469%Includes a $14k retro payment in March covering Jan 2025–Feb 2026 travel for the interim General Manager.
Community communications (G&A)$39,843$9,000443%Utility invoices and Pipeline; $6.8k in the last three months for Prop 218 notices and water moratorium meetings. Part should be reclassified as postage.
Repairs & maintenance (G&A)$77,632$18,801413%Cleaning $25k YTD, landscaping $6.5k, e-waste $4.8k, and $22k to demolish the Safety Center.
Telecommunications (Ops)$105,047$31,000339%All AT&T wireless and landline; landline cost increase in May. Under-budgeted.
Legal fees (G&A)$270,484$90,000301%Matters involving FSA and developer activity; invoices to be reclassed to FSA and to the nonoperating developer section.
Repairs & maintenance (Ops)$715,246$267,360268%Itemized month by month — see below.
Memberships & subscriptions (G&A)$26,027$10,501248%—
Board & committee meetings$4,027$1,701237%—
Travel & mileage (Ops)$58,441$27,000216%Not enough budgeted for this category.
Rental / lease (Ops)$22,727$11,000207%—
OPEB (G&A)$445,989$249,782179%Budgeted $250k; actual CalPERS actuarial payment was $464k. Under-budgeted.
Tools & supplies (Ops)$313,378$216,000145%Recurring bulk purchases plus spending driven by the repairs issues below.
Bank analysis fees$10,657$8,499125%—
Chemical (Ops)$336,176$280,000120%—
Contractual services (Ops)$1,917,268$1,794,316107%~$1.5M (79%) to California Waste Recovery Systems; $53k county Cal Waste surcharges; $20k Lumos rate study; $268k Domenichelli & Associates, to be reviewed for possible reclass to development activity.

Not every overrun is new spending

Two of the biggest percentages are budget-placement artifacts, not surprise costs. Capacity Purchase was budgeted at $376,825 and spent $0, while operating Utilities was budgeted at $0 and spent $367,811. Staff explains that roughly 99.8% of the utility budget was allocated to the Capacity Purchase account; combined, the three accounts land at 119% of budget. pp. 146, 150 Similarly, Regulatory–Inspections ($94,857 against no budget) is a newly created account for utility-plant inspection costs previously coded to consulting. p. 146

Lines significantly under budget

Under-budget lines pp. 146, 148, 150–151
Line itemActualBudget% of budgetReason given
Benefits, taxes & pension (Ops)$607,099$1,170,42952%Lower than expected even accounting for vacancies.
Benefits, taxes & pension (G&A)$217,165$410,09853%Over-budgeted.
Postage$21,166$38,00156%Some postage sitting in community communications instead.
Salaries & wages (G&A)$851,321$1,012,79084%GM, Director of Finance, A/P and HR Accounting Technician not fully staffed; filled temporarily and recorded in consulting. Includes ~$46,000 February retro payment to the Interim GM.
Salaries & wages (Ops)$2,152,894$2,329,46492%Director of Operations vacant; several security positions unfilled early in the year; February security supervisor adjustments and April/May retroactive adjustments for unrepresented employees.
Residential fees (revenue)$8,273,719$8,583,93296%Budget was calculated on number of connections rather than invoices.

The repairs & maintenance story, month by month

Staff itemizes the operating repairs line pp. 146–147: July — lift repairs $30k and annual gas feeder service $11k (the lift work is the Alameda rehab CIP project, to be reclassified; gas feeders serve the wastewater plant chlorine system). August — asphalt patch $9k. October — $17k motor replacement at the Granlees lift station, $13k lake maintenance for quarterly water testing. November — $31k vacuum truck rental for the 6B lift station flooding event, $12k asphalt/concrete, $11k equipment calibrations. December — $15k aquatic weed harvesting, $13k vacuum truck, $12k basin analyzer for the wastewater EQ basin. January — $16k generator rental while the wastewater plant generator was repaired. February — $23k algae cleanup. March — $18k lift and generator repairs, $13k vacuum truck. May — $19k Cal Fire crew for November emergency work. June — $57k pond work, $16k equalization basin repair and installation, $12k water treatment plant repairs, $11k air compressor maintenance.

A pattern worth naming

Read as a list, these are largely reactive repairs — flooding response, a failed generator, a failed motor, an analyzer replacement — rather than scheduled replacement. The auditor's separate observation that the District has not verified the completeness of its capital asset records p. 17 and staff's note that a lift repair belongs in a CIP project p. 147 are two sides of the same question: does the District know what it owns, how old it is, and when it is due?

12 — Cash & reserves

Cash, reserves, and the $2.6M transfer idea

The last three pages of the packet contain the single most consequential proposal in it — and it arrives as a suggestion, not a recommendation for action.

Cash and investments, June 30 p. 157
Account6/30/20266/30/2025Change
Banner — money market (operating, unrestricted)$2,417,856$3,631,354($1,213,498)
CAMP (restricted)$770,289$739,961+$30,328
CA CLASS (restricted)$9,721,573$9,345,839+$375,734
Total$12,909,717$13,717,155($807,438)

Staff attributes the year-over-year decline primarily to Capital Improvement Project spending paid directly out of the Banner operating account, without corresponding transfers from CAMP and CA CLASS to reimburse those capital expenditures. p. 158

The reserve target and the proposed transfer

Under the District's Operating Fund and Reserve Fund Policy, the target is enough cash to fund roughly six months of operating expenditures — estimated at approximately $5 million based on the June 2026 statements. Unrestricted funds stood at about $2.4 million. Staff writes that to reach the target it "may be appropriate to transfer approximately $2.6 million from the restricted investment accounts to the unrestricted Banner account," which would reduce restricted balances to about $7.9 million. The final amount will not be known until the annual audits are completed and year-end balances finalized. p. 158

Three things staff itself flags about that transfer

1. Even after the transfer, restricted balances of roughly $7.9 million would be low relative to the District's net fixed assets of approximately $31 million (a figure taken from the FY24 audit), given the ongoing cost of maintaining and replacing capital infrastructure.

2. Interest rates have declined compared with 2025, which may reduce future investment earnings.

3. The final transfer amount depends on completing the audits — the same audits that are two years behind. p. 158

Cross-reference before forming a view

The auditor's management letter says the reserve policy and the general ledger do not currently agree, and that two reserves carry negative balances. p. 111 The reserve policy is the document that defines what "restricted" means here and what may be moved. Whether the $2.6 million is a routine reimbursement of capital spending already made, or a reduction in capital reserves, depends on which reserves the money comes from — which the packet does not break out.

An oddity in the yield table

The average yield rows show CAMP and CA CLASS at 3.1%–3.9% for January through April 2026, then jumping to 7.5% and 7.4% in May and 8.1% and 7.4% in June; the 2025 rows show a similar jump to 8.8% and 8.7% in May and June 2025. p. 157 Yields at that level are not typical for California local government investment pools. This looks like a reporting or annualization artifact rather than actual earnings, and it is a fair, low-stakes clarifying question. Note that investment earnings for the year totaled $82,973 against a $97,000 budget p. 150 — consistent with ordinary pool yields, not 8%.

13 — Subsequent events

Settlements and contracts after year-end

Note 14 of the FY24 statements discloses three items that happened after June 30, 2024 but before the audit was drafted.

  • A legal claim settled in May 2025 for $375,000, of which the District is responsible for $200,000 and insurance covers the remainder. p. 50
  • In November 2024, a construction agreement for the Wastewater Treatment Facility Sodium Hypochlorite Improvements / Chlorine Contact Basin Expansion – Phase 1 Project in the amount of $2,402,558. p. 50
  • In May 2025, a construction agreement for the Equestrian Access Culvert Project in the amount of $343,000. p. 50

Commitments and contingencies

Note 13 records the solid waste agreement with California Waste Recovery System, entered in 2023 and running to June 30, 2035 with an option to extend, with rates rising annually by CPI capped at 5.5% per year. p. 50 It also records that $540,000 of landowner funding originally reserved for Phase 2 of the water treatment plant expansion was used to cover Phase 1 cost overruns; if Phase 2 ever proceeds, the District must provide that $540,000 within 12 months of notification. As of June 30, 2024 the landowners had not moved forward and the funding remains with the District. p. 50

Insurance is through the Golden State Risk Management Authority pool: $350,000 GSRMA / $1,000,000 commercial for general and auto liability, up to $25,000,000 commercial for property damage, $10,000,000 for employee coverage, and statutory workers' compensation above a $300,000 GSRMA layer. p. 49

14 — Navigation

Navigation gotchas in the packet

Four small things that will cost you time if nobody warns you.

  • Two page-numbering systems. Each audit report carries its own internal page numbers in the center footer (1, 2, 3…) and the packet's running number in the bottom-right corner. When the slides say "Note 7, pages 32 to 36," those are internal report pages, not packet pages. Use the bottom-right number for anything cited in this guide.
  • Note numbers on the slides don't match the statements. The presentation refers to the pension plan as Note 7 and OPEB as Note 8 pp. 9–10, but in both the FY23 and FY24 draft statements pension is Note 8 pp. 41, 86 and OPEB is Note 9 pp. 44, 90. The required communications letter uses the statement numbering. p. 106
  • A label appears to be transposed on one slide. The second Statement of Net Position slide lists liabilities and totals the column as "Total Assets $11,419 / $10,015." p. 6 The audited statements show that figure as total liabilities and deferred inflows, not assets. p. 21 Total assets are $48,489 thousand.
  • Two pages are effectively blank — pages 141 and 159 — so a jump of one page in the middle of the memo isn't a missing exhibit.
15 — Document trail

The packet was revised on Aug 21

Two versions of the same packet circulated. The later one is longer, and the difference is substantive.

An earlier PDF of this packet runs 153 pages; the later PDF runs 158 pages. Both carry the same agenda page and the same posting note. The difference is entirely inside the auditor's opening presentation:

What changed between versions
Earlier version (153 pp.)Later version (158 pp.)
One combined "Highlights of Financial Statements" slide, leading with negative unrestricted net position of $1.6 million (due to $7.6 million of pension and OPEB liabilities), revenues exceeding expenses by $1.9 million, all funds except Security showing net income, $1.6 million of depreciation, and the CFD custodial fund summary. Four new data slides — Statement of Net Position (assets), Statement of Net Position (liabilities), Statement of Net Position (net position), and Statement of Revenues/Expenses — plus two reorganized Highlights slides that split the CFD, pension and OPEB detail apart. pp. 5–10

What the change does

The revision adds detail: the actual balance sheet and income statement numbers now appear in the presentation rather than only in the 130 pages of statements behind it. It also relocates the plainest summary sentence in the earlier deck — "negative unrestricted net position of $1.6 million" — into a line inside the Net Position table. p. 7 The figure is still there and still negative. It is no longer the first bullet a reader sees.

If you cite the packet, say which version. Anyone who downloaded before the afternoon of August 21 has a different document.

16 — For the record

Questions worth asking

Each of these is answerable from the packet's own contents, and each is neutral on its face. Public comment comes at item 2, before the presentations.

  1. When will the FY23 and FY24 audits be signed and issued?Every audit document in the packet is a draft with a blank date line. pp. 19, 57, 107, 111
  2. What is the target date for completing the FY25 audit, and the FY26 audit?FY25 prep began end of July 2026 with four months of FY25 accounting still to be entered; FY26 bank reconciliations are about 30% done. pp. 140, 142
  3. Will the Board see a schedule for finishing the developer-donated infrastructure inventory?Finding 2021-002 dates to 2020, references a transaction from 2007, and the auditor says the issue still exists. It is the sole reason for the qualified opinion. pp. 17, 59
  4. When will the investment policy come to a Board agenda?Last updated 2016; annual Board review is required by the Government Code; District response was "No change." p. 111
  5. What is the plan for the reserves carrying negative balances?The Water Capital Improvement Fee Reserve and Security Capital Improvement Fee Reserve are named; District response was "No comment." p. 111
  6. Which specific reserves would the $2.6 million transfer draw from, and does the reserve policy permit it?The proposal appears once, in a staff summary paragraph, without a fund-level breakdown. p. 158
  7. Is the $2.6 million a reimbursement of CIP spending already made from Banner, or a net reduction in capital reserves?Staff says CIP was paid from Banner without reimbursing transfers — which frames it as reimbursement — but the two readings have different implications for capital replacement capacity. p. 158
  8. Will MD&A be included when the audits are issued?The auditor notes management omitted it. It is the narrative section residents can actually read. p. 19
  9. How much of the $268,000 paid to Domenichelli & Associates, and the $270,484 in legal fees, will be reclassified to developer activity?Staff says both are under review for reclassification, which would move them out of ratepayer-funded operating expense. pp. 147–148
  10. Will the FY27 budget be rebuilt for the lines that were structurally under-budgeted?Staff describes training, telecommunications, travel, OPEB, tools and supplies, and HR recruitment as under-budgeted rather than overspent. pp. 146–149
  11. Will residential fee revenue be budgeted on invoices rather than connections going forward?Staff identifies this as the reason revenue came in at 96% of budget. p. 146
  12. What explains the 7–8% average yields shown for CAMP and CA CLASS in May and June?Total investment earnings of $82,973 for the year suggest ordinary pool yields. pp. 150, 157
  13. Is the Alameda rehab lift station work being properly capitalized as CIP?Staff flags it as needing reclassification out of repairs and maintenance. p. 147
  14. Will a preventive maintenance and asset replacement schedule come back to this committee?Repairs and maintenance ran 268% of budget on largely reactive work. pp. 146–147, 150
17 — Finding aid

Full page index

Type a topic to filter. Page numbers are the packet's own bottom-right numbers in the 158-page version.

Page index — Aug 24, 2026 Finance packet
PagesContentsSection of packet
1Agenda, posting note, ADA and Brown Act languageAgenda
2–14Richardson & Company slide presentation (Ingrid Sheipline)Item 3 — presentation
3Reports issued: financial statements, internal control report, required communications, management letterItem 3 — presentation
4Audit results and observations summaryItem 3 — presentation
5–7Statement of Net Position slides: assets, liabilities, net positionItem 3 — presentation
8Statement of Revenues/Expenses slideItem 3 — presentation
9–10Highlights: CFD custodial fund, pension plan, OPEB planItem 3 — presentation
11Report on internal control: current and prior year findingsItem 3 — presentation
12Required communications: audit adjustmentsItem 3 — presentation
13Management letter summary: retention, checks, reserve policy, investment policyItem 3 — presentation
15–59FY2024 draft financial statements and reportsFY24 audit
17–19Independent Auditor's Report — qualified opinion on Water & Sewer, unmodified on Drainage, Solid Waste, Security; MD&A omissionFY24 audit
20–21Statements of Net Position by fund, June 30 2024FY24 audit
22–23Statements of Revenues, Expenses and Changes in Net Position; capital contributions and donated infrastructureFY24 audit
24–26Statements of Cash FlowsFY24 audit
27–28Fiduciary net position — custodial funds (CFD)FY24 audit
29–32Note 1 — summary of significant accounting policiesFY24 notes
33–35Note 2 — cash and investmentsFY24 notes
36–37Note 3 — interfund transactions; Note 4 — notes receivableFY24 notes
37–38Note 5 — capital assetsFY24 notes
39Note 6 — long-term liabilitiesFY24 notes
40Note 7 — net positionFY24 notes
41–43Note 8 — pension plans (CalPERS)FY24 notes
44–48Note 9 — other postemployment benefits (OPEB)FY24 notes
49Note 10 — special assessment district (CFD 2014-1); Note 11 — insurance (GSRMA); Note 12 — Proposition 218FY24 notes
50Note 13 — commitments and contingencies (Cal Waste to 2035, $540,000 Phase 2); Note 14 — subsequent events ($375,000 settlement, $2,402,558 and $343,000 contracts)FY24 notes
51–54Required supplementary information — pension and OPEB schedules (unaudited)FY24 audit
55–57Independent Auditor's Report on Internal Control and Compliance — material weaknesses 2022-001, 2021-001, 2021-002FY24 audit
58–59Schedule of prior year findings with District responsesFY24 audit
60–104FY2023 draft financial statements and reports (parallel structure to FY24)FY23 audit
62–64FY23 Independent Auditor's ReportFY23 audit
65–67FY23 Statements of Net Position and Revenues/ExpensesFY23 audit
72–73FY23 fiduciary statements — custodial fundsFY23 audit
86–89FY23 Note 8 — pension plansFY23 notes
90–92FY23 Note 9 — OPEBFY23 notes
93–95FY23 Notes 10–14 — CFD, insurance, Prop 218, commitments, subsequent eventsFY23 notes
100–104FY23 internal control report and schedule of prior year findingsFY23 audit
105–107Required Communications Letter — engagement letter April 9 2025, significant risks, audit adjustments, no disagreements with managementAuditor letters
108–109Summary of unadjusted differences, FY2023 and FY2024Auditor letters
110–111Management Letter — document retention, check generation, reserve policy, investment policyAuditor letters
112–125CFD 2014-1 FY2024 draft audit — statements and notesCFD 2014-1
117–118CFD statement of net position and statement of activities, June 30 2024CFD 2014-1
119CFD Note A — formation, $5,960,000 bond issue, Mello-RoosCFD 2014-1
126–139CFD 2014-1 FY2023 draft auditCFD 2014-1
140Memorandum, Aug 12 2026 — Cecilia Min, Director of Finance and Administration: audit status FY23/24 complete, FY24/25 preparationItem 4 — status
142Audit 25/26 status — bank reconciliation ~30%; accounting 26/27 July in progressItem 4 — status
143–144FY2026 financials cover and commentary — preliminary, subject to changeItem 5 — financials
145Overall results and results by fund — $819,000 operating lossItem 5 — financials
146–149Detailed variance analysis — operating revenue, operating expenses, G&A, nonoperatingItem 5 — financials
150–152Statement of Revenue and Expenses by fund with budget and % of budget columnsItem 5 — financials
153–155Monthly statement of revenue and expenses, July 2025 – June 2026Item 5 — financials
156–157Cash and investment balances — Banner, CAMP, CA CLASS, Jan–Jun 2026 and 2025Item 5 — financials
158Summary of cash and investments — six-month reserve target, proposed $2.6 million transferItem 5 — financials
18 — Definitions

Plain-English glossary

Terms used in this packet that mean something specific in government accounting.

Unmodified (clean) opinion
The auditor found the statements fairly presented with no exceptions.
Qualified (modified) opinion
Fairly presented except for one identified issue. Here, unverified developer-donated infrastructure in Water and Sewer.
Material weakness
An internal control gap serious enough that a material misstatement could go undetected. The most severe of the three finding levels; a "significant deficiency" is the middle level.
Net position
The government equivalent of equity: assets plus deferred outflows, minus liabilities and deferred inflows.
Unrestricted net position
The portion not tied up in capital assets or legally restricted. RMCSD's is negative, largely because pension and OPEB liabilities are counted here.
OPEB
Other Post-Employment Benefits — retiree health and similar benefits other than pension. RMCSD's net OPEB liability at June 30, 2024 was $2,636,958.
Operating vs. nonoperating
Operating is the day-to-day business of delivering water, sewer, drainage, solid waste and security. Nonoperating includes property taxes, interest, grants and capital contributions.
Donated / contributed infrastructure
Pipes, mains and facilities built by a developer and deeded to the District. Recorded as a non-cash capital contribution — it increases assets and net position without generating cash.
Custodial / fiduciary fund
Money the District holds on behalf of someone else. The CFD's bond funds sit here; the District is the agent, not the debtor.
Component unit
A legally separate entity for which the District's board is financially accountable — here, CFD 2014-1, audited separately in the same packet.
Mello-Roos / CFD
A Community Facilities District, formed under the 1982 Mello-Roos Act, that levies a special tax on parcels inside its boundary to repay bonds that funded infrastructure.
Restricted vs. unrestricted cash
Restricted funds are limited by law, bond covenant or Board policy to particular uses, typically capital. Unrestricted is available for operations. Which reserves are which is defined by the District's reserve policy — the document the auditor says doesn't currently match the ledger.
CAMP / CA CLASS
California Asset Management Program and California CLASS — pooled investment programs used by California local agencies. RMCSD holds most of its restricted cash in these.
MD&A
Management's Discussion and Analysis — a required narrative in which management explains its own financial results. Omitted from these draft statements.
Prop 218
The 1996 constitutional amendment governing how property-related fees such as water and sewer rates may be set and protested.
Reclassification ("reclass")
Moving an already-recorded amount from one account to another so it lands in the right category. Several FY26 figures in this packet are marked for reclassification.
Special meeting
A meeting called outside the regular schedule. Under the Brown Act it requires 24 hours' notice and the agenda may not be added to at the meeting.
19 — Sources

Sources & links

Everything in this guide comes from the primary documents below. Read them yourself; the page numbers are all here.